NOTE: The official documentation site is HERE at CERN.
Information here is for historical interest.
|
| Layout and Schematics (Rev 2) | HTR_SLB_24Jul06.zip - Gerber data | 2006-07-24 |
|---|---|---|
| Layout and Schematics (Rev 1) | htr_slb_pdf.zip (PDF of each layer) | 2006-02-28 |
| oslb_v1.1.zip (Gerber data - as built) | 2006-03-03 | |
| Parts List | htr_slb_bom.pdf | 2006-02-14 |
| VME Rocket-I/O Tester | As Built, March '04 |
| VME_Schem_23Oct03.pdf | |
| VME_LTB_design.zip OrCAD design | |
| VME_LTB_gerber.zip Gerber files to submit | |
| Reference Documents for PCB prototype design | |
| VME Interface design from Princeton | |
| SLB Pinout on HTR | |
| CMS Trigger | |
|---|---|
| Level 1 Trigger home page | |
| CMS Trigger Overview (9/13/02 - W. Smith) | |
| SLB Spec | |
| note02_022.pdf - CMS Note on RPC Trigger |